comparemela.com

Latest Breaking News On - Stormwater drains - Page 2 : comparemela.com

Grate power

To avoid flooding on roads, BBMP installs metal gratings. Water seeps through the gratings and flows into the stormwater drains. However, civic body often encountered the problem of having to replace the steel gratings as they corrode over the years. After successful attempts with FRP gratings in Tender Sure roads, BBMP will now install all gratings with FRP material.

Bengaluru
Karnataka
India
Melvin-mathew
Tender-sure
Stormwater-drains
Steel-gratings
Rfp-gratings
Fibre-reinforced-polymer
Civic-body
Bbmp

chennai rain: Chennai flood: How high-tech IT hub turns into Venice with no power

Chennai s prominent IT corridor, OMR, experienced severe flooding due to heavy rainfall. The inadequate stormwater drainage system and low-lying location exacerbated the situation. Residents in affected areas faced a shortage of essential supplies and a lack of response from elected representatives. The low-lying nature of OMR and the overflow of lakes and stormwater drains contributed to the flooding.

Perungudi
Tamil-nadu
India
Chennai
Buckingham-canal
India-general
Raj-bhagat
Confederation-of-sholinganallur-constituency-residents-welfare-associations
World-resources-institute
Mount-road
Secretariat-colony
Chennai-rain

91 Lakes, 1 plea: Rescue now!

The petition highlighted the need to issue closure orders and fines for industries polluting lakes within Bengaluru, especially for Bellandur Lake, as ordered by the NGT. Collect data on water quality, publish it in the public domain, and create and implement lake restoration and rejuvenation plans.

Bengaluru
Karnataka
India
Bangalore
Vinod-jacob
Ram-prasad
Marishia-rodrigues
Bande-nalla-sandra
Namma-bengaluru-foundation
Environmental-management-policy-research-institute
Namma-bengaluru
Environmental-management

Turning trash to treasure

Bengaluru East Taluk Panchayat Executive Officer Vasanth Kumar said, “The construction of the animal waste processing plant is in progress. I expect the construction work to be completed in two months and plant.”

Mulbagal
Karnataka
India
Kannur
Kerala
Bengaluru
Suresh-ramasamy
Abhishek-gowda
Sandeep-kumar
Lingaraj-urs
Aravind-limbavali
Vasanth-kumar

vimarsana © 2020. All Rights Reserved.