The selected agency will report to the Palike about the specific interventions needed in each junction. In the BBMP budget 2023-2024, the state government had allocated 150 crores for the Suraksha 75 project. However, as per the tender, it’s estimated that the Suraksha 75 project would need Rs 100 crore. BBMP has floated the tender for DPR in 15 packages.
A whopping 26 of Maharashtras 36 districts are reeling under heatwave conditions with average temperatures of 40 degrees Celsius and higher in the past two-three days, as people braced and experts sounded warnings.According to the IMD's latest .
The rising temperature is fraught with risks to public health and the concerned authorities as well as the people are advised to take immediate measures to ensure safety of the masses.
This paper encapsulates the insights shared by industry experts on the current safety concerns and the way forward for a safer EV battery ecosystem in India.