peak power demand: Peak power demand to touch 3.5 lakh MW by 2030-31, says Union Minister R K Singh

Card image cap

The minister said 27,180 MW of thermal capacity is under construction, 12,000 MW has been bid out and 19,000 MW is under clearances. The total anticipated thermal capacity addition by 2031-2032 will be 87,910 MW.

Related Keywords

India , Lok Sabha , Power Survey , Union Minister Rk Singh , Electric Power Survey , Peak Power Demand , Rk Singh , Electricity Demand , Power , Generation Capacity , Thermal Capacity ,

© 2024 Vimarsana

comparemela.com © 2020. All Rights Reserved.