Koryx Copper Intersects 124.44 Metres at 0.36% Cu Eq, Includ

Koryx Copper Intersects 124.44 Metres at 0.36% Cu Eq, Including 26 Meters at 0.45% Cu Eq and 2 Metres at 1.17% Cu Eq

Figure 1: Planview showing the positions of the boreholes being reported here. Significant copper and molybdenum intersections include: HM21 : 0.36% CuEq over 124.44 metres including 0.45% CuEq over 26 metres; and 1.17% CuEq over 2 metres; and 1.04% CuEq over 2 metres; and 0.43% CuEq over 16 metres.HM16: 0.32% CuEq over 18 metres from near surface including 6m @ 0.45% CuEq. VANCOUVER, British Columbia, Feb. 15, 2024 (GLOBE NEWSWIRE) -- Koryx Copper Inc. ("Koryx" or “the Company") (TSX-V: KRY) an

Related Keywords

Zambia , Canada , Namibia , United Kingdom , South Africa , Johannesburg , Gauteng , Copperbelt , Eastern , Vancouver , British Columbia , Haib , Karas , British , Canadian , , Drilling Program , Regulation Services Provider , Koryx Copper Inc , National Instrument , Laboratories Ltd , Venture Exchange , Testing Laboratory , Haib Copper , Haib Copper Deposit , Induced Coupled Plasma , Mineral Resources , Indicated Mineral Resources , Dean Richards Pr Sci , Qualified Person , Haib Project , Haib Copper Project , Koryx Copper , Canadian Securities Regulators , News Release , Assay Results , The Company , Southern Namibia , Target Area ,

© 2025 Vimarsana