As reported by NCE sister title Ground Engineering, the Land Transport Authority’s (LTA’s) Thomson East Coast Line stage three (TEL3) is a 13km section of
The Land Transport Authority’s (LTA’s) Thomson East Coast Line stage three (TEL3) is a 13km section of the Thomson East Coast Line, which will span 43km
The contracts were awarded as part of the first phase of the 29km Cross Island Line (CRL1) project – Singapore’s eighth Mass Rapid Transit line and the
Petaling Jaya: A Gamuda Bhd joint-venture company has won a RM1.45bil contract to design and construction of the Defu station and Tunnels in Singapore with Wai Fong Construction Pte Ltd.