Patel Engineering is locked its upper circuit limit at Rs. 28.58, up by 1.36 points or 5.00% from its previous closing of Rs. 27.22 on the BSE. Patel Engineering The scrip opened at Rs. 28.01 and has touched a high and low of Rs. 28.58 and Rs. 28.01 respectively. So far 1461128 shares were traded
Patel Engineering Limited has been awarded the LOA from City and Industrial Development Corporation for the construction of a 6.70 km long treated water tunnel and associated works from Sai Village to Vindhane Village in Raigad District, Maharashtra.
CIDCO and Visvesvaraya Jala Nigam Ltd have declared Patel Engineering Limited as L1 for works including design and construction of a long treated water tunnel from Sai Village to Vindhane Village in Raigad District.
涉期約行賄30萬「搓圓仔湯」 嘉縣村長起訴 - 社會 ltn.com.tw - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from ltn.com.tw Daily Mail and Mail on Sunday newspapers.