Boston Logan International Airport ranked 5th worst for “mega-airports” in the United States in J.D. Power’s “Customer Satisfaction” study for 2023, released in the past week.
Shortly after the Sumner Tunnel reopened following the summer-long closure, drivers are continuing to face massive traffic on local roadways around Logan Airport. Weekend closures of the tunnel are back amid ongoing work at the airport.
Daytime Bridge Machinery Installation at Chelsea Street Bridge The Massachusetts Department of Transportation (MassDOT) is announcing that it will be conducting work to install span guide roller machineries on the Chelsea Street Bridge in East Boston and Chelsea. This work is scheduled to take place Monday through Friday, during the hours of 9:00 a.m. to 3:00 p.m.