Mumbai (Maharashtra) [India], February 22 (ANI/NewsVoir): A major milestone was achieved on the Udhampur Srinagar Baramulla Rail Link project (USBRL) on February 15, 2022, with the breakthrough of Tunnel T49 between Sumber and Arpinchala Stations on the ongoing Katra-Banihal Section.
The main tunnel of T-49, the longest tunnel of Indian Railways, between Sumber and Arpinchala station of Katra-Banihal section of Udhampur- Srinagar-Baramulla Rail Link (USBRL) project has been connected successfully on Tuesday, informed Northern Railways.
The main tunnel of T-49, the longest tunnel of Indian Railways, between Sumber and Arpinchala station of Katra-Banihal section of Udhampur- Srinagar-Baramulla R
The main tunnel of T-49, the longest tunnel of Indian Railways, between Sumber and Arpinchala station of Katra-Banihal section of Udhampur- Srinagar-Baramulla R
T-49 is a tunnel of length 12.758 km long and it is going to be the longest tunnel of Indian Railway surpassing Peer Panjal Tunnel of 11.2 km length constructed by USBRL on the Banihal-Qazigund section.