Home » Internet » Skeena Intersects 155.76 g/t Au over 3.22 metres at Snip Gold Project
Skeena Intersects 155.76 g/t Au over 3.22 metres at Snip Gold Project Posted by PublisherInternet Friday, 21. May 2021
Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (?Skeena? or the ?Company? – https://www.commodity-tv.com/ondemand/companies/profil/skeena-resources-ltd/) is pleased to report diamond drill core results from the 2021 Phase 3 infill and exploration drilling program at the Snip gold project (?Snip? or the ?Project?) located in the Golden Triangle of British Columbia. The Phase 3 program is designed to upgrade areas of existing Inferred resources from the Company?s 2020 Mineral Resource Estimate (MRE), to the Measured and Indicated categories. Reference images are presented at the end of this release as well as on the Company?s website.
Qualified Persons
Exploration activities at Snip are administered on site by the Company?s Exploration Managers, Raegan Markel, P.Geo. and John Tyler, P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting the exploration activities on its projects.
Quality Assurance ? Quality Control
Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample strea