To meet the traffic demand, 3.2 m wide and 21.7 m length AC rolling stock is recommended for running suburban rail services in Bengaluru. The design speed is 90 mph and the operational speed shall be 80 mph (except at stations). The operating speed at stations shall be 50 mph. The operating speed in depots shall be 25 mph. The train power supply shall be fed by 25KV- AC Overhead Equipment System. As of now, for Corridor 2, a 220KV receiving substation has been proposed in Mathikere.
Mumbai, January 5th, 2023: The Transportation Infrastructure Business of L&T Construction successfully commissioned the Electrical & Mechanical System for Phase-1 (11.4 km) of the Dhaka Metro Line 6.
Work On Delhi-Ghaziabad-Meerut RRTS Corridor Gains Pace In 2021 swarajyamag.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from swarajyamag.com Daily Mail and Mail on Sunday newspapers.