Central Railway will operate 36 hours infrastructure block on Up and down slow lines between Thane and Kalva stations for carrying out cut and connection of newly laid track and commissioning of crossovers in connection with Thane-Diva 5th and 6th lines The block will be operated on Up and Dn slow lines from 02.00 pm on Saturday to 02.00 am on Monday.
Central Railway will operate a special infrastructure block on Up and Down slow lines between Kalva and Diva for cut and connection of newly laid slow line with existing slow lines for diversion in connection with Thane - Diva 5th and 6th lines.