During the period under review, the company conducted an exploratory core drilling to 41,837 metres, 2.7 times higher than 15,460 metres in the same period last year. MOIL, under the Ministry of Steel, meets about 46 per cent of the total requirement of dioxide ore in the country. At present, the average annual production is around 1.3 million tonnes.