CHIEF Minister Datuk Seri Hajiji Noor said a RM4 billion Hydroelectric Dam will be built at Ulu Padas in Tenom as a long-term solution to the water shortage in Sabah.
PAPAR, Aug 25 A RM4 billion hydroelectric dam will be built at Ulu Padas, Tenom as a long-term solution to the state’s perennial water shortage, said Sabah Chief Minister.
KOTA KINABALU: A RM4bil hydroelectric dam will be built in Sabah’s interior Tenom district as a long-term solution to the state’s chronic water supply problem, says Datuk Seri Hajiji Noor.
PAPAR (Aug 25): The RM4 billion hydroelectric dam to be built at Ulu Padas, Tenom will be a long-term solution to the water shortage in Sabah, said the Chief Minister.
Datuk Seri Panglima Hajiji Noor said the dam, to be launched in October, is expected to be completed in 2027 and have a capacity