comparemela.com

Page 18 - Joey Wilkins News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Aztec Minerals Corp : Aztec/Kootenay Joint Venture Plans Two Phase, CAD$1 1 Million Exploration Program in 2021 at Cervantes Gold-Copper Project, Sonora, Mexico

(2) VANCOUVER, BC / ACCESSWIRE / January 26, 2021 / Aztec Minerals Corp. (TSXV:AZT)(OTCQB:AZZTF) and Kootenay Silver Inc. plan a two-phase, CAD$1.13 million exploration program in 2021 for the Cervantes porphyry gold-copper property in Sonora, Mexico. Aztec (65%) and Kootenay (35%) recently formed a 65/35 joint venture ( JV ) and the JV Management Committee met last week to review and approve the following Phase 1 and 2 exploration programs for 2021. The JV plans to start work in the 1 st quarter on a Phase 1, CAD$85,000 program of soil and rock sampling and geological mapping (525 soils and 150 rocks will be analyzed) to extend the 100 meter (m) by 100m geological and geochemical grid to the north, west and east boundaries of the property. Mapping will focus on detailed lithological, structural, and alteration mapping of the California, California North, and Estrella targets.

Aztec/Kootenay Joint Venture Plans Two Phase, CAD$1 1 Million Exploration Program in 2021 at Cervantes Gold-Copper Project, Sonora, Mexico

Aztec/Kootenay Joint Venture Plans Two Phase, CAD$1 1 Million Exploration Program in 2021 at Cervantes Gold-Copper Project, Sonora, Mexico
pittsburghstar.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from pittsburghstar.com Daily Mail and Mail on Sunday newspapers.

Aztec Minerals Corp : Aztec Reviews Geological Highlights of Phase 1 RC Drill Program from Tombstone Project, Arizona

(2) VANCOUVER, BC / ACCESSWIRE / January 12, 2021 / Aztec Minerals Corp. (TSXV:AZT)(OTCQB:AZZTF) reviews the geological highlights of the recently completed Phase 1, reverse circulation (RC) drill program conducted at the Tombstone project in Southeastern Arizona from August to November 2020. The Phase 1, 21-hole, 2,993 meter drill program tested the potential for shallow, broad, bulk tonnage gold-silver mineralization around and below the Contention open pit and underground mine workings. The Contention Mine was historically the largest and highest grade silver mine in the Tombstone silver district (32 million oz past production) in the late 1800 s-early 1900 s. More recent Contention open pit mining in the early to mid-1980 s focused on gold-silver mineralization to approximately 60m depth entirely hosted within the Cretaceous Bisbee group sandstones. Most other mines in the district were much smaller veins and mantos hosted within the lower Bisbee and partially within the unde

Aztec Reviews Geological Highlights of Phase 1 RC Drill Program from Tombstone Project, Arizona

Aztec Reviews Geological Highlights of Phase 1 RC Drill Program from Tombstone Project, Arizona
newjerseytelegraph.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from newjerseytelegraph.com Daily Mail and Mail on Sunday newspapers.

Aztec Reports Final Phase 1 Drill Results for Tombstone Project in Southeastern Arizona, Intersects 6 36 gpt Gold Equivalent over 7 62 m and 0 62 gpt Gold Equivalent over 140 21m

Aztec Reports Final Phase 1 Drill Results for Tombstone Project in Southeastern Arizona, Intersects 6 36 gpt Gold Equivalent over 7 62 m and 0 62 gpt Gold Equivalent over 140 21m
albuquerqueexpress.com - get the latest breaking news, showbiz & celebrity photos, sport news & rumours, viral videos and top stories from albuquerqueexpress.com Daily Mail and Mail on Sunday newspapers.

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.