Aztec Minerals Corp.: Aztec Reports Final Phase 1 Drill Results for Tombstone Project in Southeastern Arizona, Intersects 6.36 gpt Gold Equivalent over 7.62 m and 0.62 gpt Gold Equivalent over 140.21m
High-grade gold-silver intercepts include 6.36 gpt AuEq over 7.62 m
Thick gold-silver intervals include 0.62 gpt AuEq over 140.21 m
19 holes of 21 holes completed in 2,993 meters Phase 1 drilling program encountered significant near surface oxide gold-silver mineralization
VANCOUVER, BC / ACCESSWIRE / December 22, 2020 / Aztec Minerals Corp. (TSXV:AZT)(OTCQB:AZZTF) announces the results of the final five drill holes from the 21 hole, 2,993 meter Phase 1 reverse circulation (RC) program, TR20-17 through TR20-21, for the Tombstone project in southeastern Arizona.