Under Prime Minister’s ‘Gati Shakti Master Plan’, the power transmission network is planned to be expanded from 4,25,500 circuit kilometer (existing as on 31.05.2020) to 4,54,200 circuit kilometer (ckm) by 2024-25 resulting in addition of nearly 28,7