comparemela.com

Latest Breaking News On - Gm northern railway - Page 1 : comparemela.com

Engineering Marvel Railways Bridge on River Chenab built 35 mtrs higher than France s iconic Eiffel tower

Bridge comprises 785 meters long steel arch spread over river; Bridge designed for blast load in consultation with DRDO; Construction of bridge taken after detailed survey; Bridge constructed to bear earthquakes; work on track laying going on, bridge to be operational soon: Officials Jammu Tawi, Dec 02: The Indian Railways has achieved a major feat by

Udhm-Bla Rail Link: 94% deck laid over World s Highest Railway Bridge on Chenab River

Jammu Tawi, Aug 1: The 111-kilometer-long Katra-Banihal section of Udhampur-Srinagar-Baramulla Rail Link (USBRL) project of Indian Railways will have seven halting stations while 94 percent deck has been laid over world highest Chenab Bridge (Arch Bridge). The work for holding cables being laid at India's first-ever cable-stayed rail at Anji Khad. The project will be operational

GM Nr Railway briefs CS - Northlines

Kashmir to be connected with rest of country through railway by end of 2023 - Jammu Kashmir Latest News | Tourism

GM Northern Railway calls on CS Excelsior Correspondent SRINAGAR, May 12: General Manager Northern Railway (NR), Ashutosh Gangal today called on the Chief Secretary, Dr Arun Kumar Mehta and apprised him about the status of the ongoing works on Udhampur-Srinagar-Baramulla Railway Link (USBRL). CAO construction Udhampur-Srinagar-Baramulla Railway Link (USBRL), A. K. Khandelwal; PCSC NR, A N Mishra; DRM Firozpur, Seema Sharma also accompanied GM NR. GM Northern Railway briefed the Chief Secretary about the works that have been finished, or […]

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.