Bridge comprises 785 meters long steel arch spread over river; Bridge designed for blast load in consultation with DRDO; Construction of bridge taken after detailed survey; Bridge constructed to bear earthquakes; work on track laying going on, bridge to be operational soon: Officials Jammu Tawi, Dec 02: The Indian Railways has achieved a major feat by