In August 2022, Columbia Gas Transmission (a subsidiary of TC Energy) filed an application with the Federal Energy Regulatory Commission (FERC) to build the Virginia Reliability Project (VRP), which includes two new compressor units and the replacement of existing pipeline (see Columbia Files w/FERC to Replace 48 Miles of Pipe in Southeast Va.). VRP will
TransCanada Corporation, which renamed itself TC Energy in 2019, bought out and merged in U.S.-based Columbia Pipeline Group (now Columbia Gas Transmission) in 2016 (see TransCanada and Columbia Pipeline Tie the Knot Today). TransCanada paid $13 billion for Columbia, including the assumption of $2.8 billion of debt. In July, TC Energy announced it was selling
Retired NiSource Chairman and CEO Gary Neale, who grew the utility into a Fortune 500 company and the country s third-largest national gas distributor, died in Colorado at the age of
We finally have some good news to share concerning Columbia Gas' project to build a tiny 3.37-mile, 8-inch pipeline under the Potomac River from Maryland to West Virginia. The project, called the Eastern Panhandle Expansion, has been blocked repeatedly by leftwing wackos in Maryland (see Fed Judge Upholds Maryland Decision to Block Pipe Under Potomac).