comparemela.com


TODAY
April 17, 2021
The Federal Government on Saturday assured Lagos residents that section one of the ongoing reconstruction/rehabilitation of the Apapa-Oshodi-Ojota-Oworonsoki Expressway project would be completed within three weeks.
The Federal Controller of Works in Lagos, Mr Olukayode Popoola, who gave the assurance during a joint inspection with the Nigerian Ports Authority (NPA), said section one of the road would be opened afterwards.
Popoola said that the rehabilitation works, which had been divided into four sections, were to ease port congestion and gridlock at the Apapa axis.
Newsmen report that section one spans from Liverpool Round through Creek Road to Beachland near Sunrise and is about 10 kms, while section two is 8.4 km and spans from Beachland to Cele Bus Stop.

Related Keywords

Apapa ,Lagos ,Nigeria ,Lagos State ,Nigerian ,Hadiza Usman ,Muhammadu Buhari ,Olukayode Popoola ,Ag Dangote Construction Company Ltd ,Nigerian Ports Authority ,Dangote Group ,Ministry Of Works ,Hitech Construction Company ,Nigerian Police ,Federal Government ,Apapa Oshodi Ojota Oworonsoki Expressway ,Federal Controller ,Liverpool Round ,Creek Road ,Cele Bus ,Apapa Oshodi Ojota Oworonshoki Expressway ,President Muhammadu Buhari ,Construction Company Ltd ,Tax Credit Scheme ,Liver Pool Round Bridge ,Bridge Ramp ,Tin Can Island ,Lagos State Government ,லாகோஸ் ,நைஜீரியா ,லாகோஸ் நிலை ,நைஜீரியன் ,நைஜீரியன் போர்ட்ஸ் அதிகாரம் ,அமைச்சகம் ஆஃப் வேலை செய்கிறது ,ஹைடெக் கட்டுமானம் நிறுவனம் ,நைஜீரியன் போலீஸ் ,கூட்டாட்சியின் அரசு ,கூட்டாட்சியின் கட்டுப்படுத்தி ,க்ரீக் சாலை ,ஸீல் பேருந்து ,கட்டுமானம் நிறுவனம் லிமிடெட் ,வரி கடன் திட்டம் ,தகரம் முடியும் தீவு ,லாகோஸ் நிலை அரசு ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.