comparemela.com


MoDOT provides update on Missouri River bridge replacement in Rocheport
COLUMBIA, Mo. (KMIZ)
Work to replace the existing Missouri River bridge is moving forward, and construction could start as soon as this fall.
The new bridge will be a design-build project, meaning MoDOT will hire one contracting team to complete the design and construction work under one contract. 
Project Director Brandi Baldwin said this will allow the project to stay within or under budget. It will also allow for the design of the bridge and the construction of the bridge to overlap.
"When we award the project, those two defined teams and their proposals are going to be providing us around a 30% complete set of plans," Baldwin said.

Related Keywords

Boone County ,Missouri ,United States ,Boonville ,Missouri River ,Cooper County ,Brandi Baldwin ,Missouri Department Of Transportation ,Director Brandi Baldwin ,Missouri Department ,Katie Trail ,Boone County Fire Protection District ,பூன் கவுண்டி ,மிச Ou ரி ,ஒன்றுபட்டது மாநிலங்களில் ,பூன்வில்லே ,மிச Ou ரி நதி ,கூப்பர் கவுண்டி ,பிராந்தி பால்ட்வின் ,மிச Ou ரி துறை ஆஃப் போக்குவரத்து ,இயக்குனர் பிராந்தி பால்ட்வின் ,மிச Ou ரி துறை ,கேடீ பாதை ,பூன் கவுண்டி தீ ப்ரொடெக்ஶந் மாவட்டம் ,

© 2025 Vimarsana

comparemela.com © 2020. All Rights Reserved.