விசன் பொறியியல் News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Stay updated with breaking news from விசன் பொறியியல். Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Top News In விசன் பொறியியல் Today - Breaking & Trending Today

- Wison Engineering Wins a Major EPC...


Wison Engineering Wins a Major EPC Contract for Gas Processing Project from Saudi Aramco
édité le 24/02/2021 - Plus de news de Wison - Voir la fiche entreprise de Wison
Wison Engineering (02236. HK) announced that it was awarded an engineering, procurement, construction (EPC) lump-sum contract by Saudi Aramco, for a gas processing project in Shaybah oil field in Saudi Arabia. This is the first oil & gas project undertaken by Wison in the Middle East, and also the first modular project in Saudi Arabia.
Shaybah Gas Processing Plant is located in the heartland of Rub al-Khali desert. In the new project, Wison Engineering will build a brownfield Dew Point Control unit at upstream of existing Acid Gas Removal Units (AGRU). This new unit will recover heavy hydrocarbons from the raw gas, remove acid gas from heavy hydrocarbons, and therefore enable to control foaming in Acid Gas Removal Units and expend gas processing capacity. ....

Rub Al Khali , Saudi Arabia General , Saudi Arabia , Hong Kong , Saudi Aramco , Wison Engineering , Middle East , Gas Processing Plant , Dew Point Control , Acid Gas Removal Units , Southeast Asia , Gaz Naturel , Super Sans Plomb , Gas Oil , Plate Forme , Cours Du Brut , Station Service , Oil And Gas , Petroleum Industry , Oil Well , தேய்க்கவும் அல் காலி , சவுதி அரேபியா ஜநரல் , சவுதி அரேபியா , ஹாங் காங் , சவுதி அரம்கோ , விசன் பொறியியல் ,

Wison Engineering Wins a Major EPC Contract for Gas Processing Project from Saudi Aramco


Wison Engineering Wins a Major EPC Contract for Gas Processing Project from Saudi Aramco
News provided by
Share this article
Share this article
SHANGHAI, Feb. 23, 2021 /PRNewswire/ Wison Engineering (02236. HK) announced today that it was awarded an engineering, procurement, construction (EPC) lump-sum contract by Saudi Aramco, for a gas processing project in Shaybah oil field in Saudi Arabia. This is the first oil & gas project undertaken by Wison in the Middle East, and also the first modular project in Saudi Arabia.
Shaybah Gas Processing Plant is located in the heartland of Rub al-Khali desert. In the new project, Wison Engineering will build a brownfield Dew Point Control unit at upstream of existing Acid Gas Removal Units (AGRU). This new unit will recover heavy hydrocarbons from the raw gas, remove acid gas from heavy hydrocarbons, and therefore enable to control foaming in Acid Gas Removal Units and expend gas processing capacity. ....

Rub Al Khali , Saudi Arabia General , Saudi Arabia , Saudi Aramco , Middle East , Gas Processing Plant , Wison Engineering , Dew Point Control , Acid Gas Removal Units , Southeast Asia , தேய்க்கவும் அல் காலி , சவுதி அரேபியா ஜநரல் , சவுதி அரேபியா , சவுதி அரம்கோ , நடுத்தர கிழக்கு , வாயு ப்ரோஸெஸிஂக் ஆலை , விசன் பொறியியல் , பனி பாயஂட் கட்டுப்பாடு , அமிலம் வாயு அகற்றுதல் அலகுகள் , தென்கிழக்கு ஆசியா ,