GEORGE TOWN: The design-and-build contractor for the Air Itam-Tun Dr Lim Chong Eu Expressway bypass (Package Two) has been slapped with a stop-work order.
GEORGE TOWN: The precast crosshead installation on the Package Two Bypass Project from Tun Dr Lim Chong Eu Expressway to Air Itam is a safe and commonly used method in the country’s construction industry.