Those coming from HSR Layout will reach the Ragigudda side via Ramp D, which runs above Ramp A and the R5 metro line, and continue with a down ramp E to access BTM Layout. Ramps A and B merge and run continuously over the existing Madiwala flyover across NH44, consisting of four solid slabs, each spanning 31 metres in width and 15.1 metres in width, with a curvature radius of 52 metres.