Password
Remember me
New to Energy Central?
Applying for membership with Energy Central allows you to connect with a network of more than 200,000 global power industry professionals.
The Sizewell C project is slated to cost £20 billion and be comprised of two EDF/Areva 1650 MWe European Pressurized Water Reactors (EWR). The Bradwell site is slated to be built as one or more, of CGN’s 1000 MWe PWR which is the Hualong One (HPR1000) reactor technology. The Chinese reactor design is now at Stage 4 of the UK Office of Nuclear Regulation Generic Design Assessment.
The Sizewelll investment is a follow-on to an investment by China in the Hinkley Point C project where two Chinese SOE’s have taken a one-third equity stake in the project. In return the government promised China the right to build the Bradwell project with one and potentially as many as three of its Hualong One reactors.