Disabled vet out $37k after contractor leaves home renovation project unfinished
KOAA
and last updated 2021-05-06 18:26:32-04
PUEBLO COUNTY â An Avondale woman spent her savings to build an ADA accessible bedroom and bathroom for her disabled husband.
After writing the check, the contractor hired to do the work started the job and then disappeared.
Wendy Dunn paid more than $37,000 up front for a two-story addition to her home back in August 2020.
KOAA
Wendy Dunn showing KOAA 5 the frame the contractor installed
According to Dunn, the upper floor was supposed to have two bedrooms for her grandchildren and the lower floor was supposed to have an accessible bedroom and bathroom for her husband -a disabled veteran.