The way around to the ocean. The master bathroom has many unique modern delights. The master bath has a tub thats filled from the ceiling. It has a shower that is quite spectacular just because of the view and the wideopen space. It also has this fabulous water tile setup that has chromatic lighting and water tile and speaker tiles as well all built into this one unit thats all run by the media module. The windows that were chosen we needed the privacy from the outside, and we needed the ventilation as well. So we chose to use the faucet section and operational section and a clear section that allows us to see the view give us us a sense of privacy and able to be open to ventilation. We designed this cloz toteset to maximize the space. The wardrobe is amazing. It gives you the capability to organize your clothes and to find them just like by a press of a button and allows us to hang 800 pieces of clothing in here. The sophistication continues in the office. And it is actually a convert
Provide privacy. Whats the date. January 30th was 2013 im sorry. 12 and january 24th of analyzing was the dr holding and the Building Permit was subsequentially otherwise on july 8, 2013, that was a complaint a building inspector went out and the Building Permit was filed it was approved by our staff that reviewed it and the dr decision said it come forward and the proposed changes to the roofdeck didnty my new notification every change requires a revision but that didnt require a new notice and this permit was issued on february 21st before this board. I did not see a 2010 permit on file i dont know what that is referenced to i dont see my reference on the tracking system. What could have been happened theres a preapplication meeting and at that time, they didnt show the roofdeck they put it on the neighborhood notification but again, i think any issue because the dr was filed specifically in regards to the roofdeck but the Planning Commission didnt take dr on this permit if you have
Provide privacy. Whats the date. January 30th was 2013 im sorry. 12 and january 24th of analyzing was the dr holding and the Building Permit was subsequentially otherwise on july 8, 2013, that was a complaint a building inspector went out and the Building Permit was filed it was approved by our staff that reviewed it and the dr decision said it come forward and the proposed changes to the roofdeck didnty my new notification every change requires a revision but that didnt require a new notice and this permit was issued on february 21st before this board. I did not see a 2010 permit on file i dont know what that is referenced to i dont see my reference on the tracking system. What could have been happened theres a preapplication meeting and at that time, they didnt show the roofdeck they put it on the neighborhood notification but again, i think any issue because the dr was filed specifically in regards to the roofdeck but the Planning Commission didnt take dr on this permit if you have
12 and january 24th of analyzing was the dr holding and the Building Permit was subsequentially otherwise on july 8, 2013, that was a complaint a building inspector went out and the Building Permit was filed it was approved by our staff that reviewed it and the dr decision said it come forward and the proposed changes to the roofdeck didnty my new notification every change requires a revision but that didnt require a new notice and this permit was issued on february 21st before this board. I did not see a 2010 permit on file i dont know what that is referenced to i dont see my reference on the tracking system. What could have been happened theres a preapplication meeting and at that time, they didnt show the roofdeck they put it on the neighborhood notification but again, i think any issue because the dr was filed specifically in regards to the roofdeck but the Planning Commission didnt take dr on this permit if you have any questions, ill be happy to answer them the changes that were