Many people have never had a hard time finding a hairstylist. Indeed, there s a large swath of the population that has never seen a hair appointment as anything other than a blissful experience, with the exception of the occasional bad cut.
But for some predominantly women with highly textured hair, who tend to be Black and brown the salon experience can feel racially divided and unwelcoming. Historically, hair has been, as with many things, viewed in terms of Black and white: A sleeker texture was thought to be the domain of white hair, while kinks and curls aka highly textured hair was seen as Black. Salons and hair-care brands emerged to serve each clientele and, even though the rest of the country has (at least officially) been desegregated, salons nationwide have remained widely separated by this distinction in client hair types.
Press release content from Globe Newswire. The AP news staff was not involved in its creation.
Skyharbour Expands Maverick East Zone with Additional High Grade Uranium Discovered in the .
Skyharbour Resources LtdJanuary 7, 2021 GMT
VANCOUVER, British Columbia, Jan. 07, 2021 (GLOBE NEWSWIRE) Skyharbour Resources Ltd. (TSX-V: SYH)(OTCQB: SYHBF) (Frankfurt: SC1P ) (the “Company”) is pleased to announce the remaining results from its 2020 fall diamond drilling program at its 100% owned, 35,705 hectare Moore Uranium Project, located approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake/McArthur River operations in the Athabasca Basin, Saskatchewan. In addition to the previously announced hole ML20-09 which returned 0.72% U3O8 over 17.5 metres from 271.5 metres to 289.0 metres, drillhole ML20-12 returned another broad zone of sandstone and basement-hosted uranium mineralization from 268.1 metres t
(2)
VANCOUVER, British Columbia, Jan. 07, 2021
) (the Company ) is pleased to announce the remaining results from its 2020 fall diamond drilling program at its 100% owned, 35,705 hectare Moore Uranium Project, located approximately 15 kilometres east of Denison Mine s Wheeler River project and proximal to regional infrastructure for Cameco s Key Lake/McArthur River operations in the Athabasca Basin, Saskatchewan. In addition to the previously announced hole ML20-09 which returned 0.72% U
3O
8 over 17.5 metres from 271.5 metres to 289.0 metres, drillhole ML20-12 returned another broad zone of sandstone and basement-hosted uranium mineralization from 268.1 metres to 286.0 metres downhole. This intercept returned 0.28% U
3O
3O
8 over 2.5 metres. Up to 2.3% Cu was intersected in clay-altered lithologies nearly 100 metres below the unconformity in this hole as well.
) (the “Company”) is pleased to announce the remaining results from its 2020 fall diamond drilling program at its 100% owned, 35,705 hectare Moore Uranium Project, located approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake/McArthur River operations in the Athabasca Basin, Saskatchewan. In addition to the previously announced hole ML20-09 which returned 0.72% U
3O
8 over 17.5 metres from 271.5 metres to 289.0 metres, drillhole ML20-12 returned another broad zone of sandstone and basement-hosted uranium mineralization from 268.1 metres to 286.0 metres downhole. This intercept returned 0.28% U
3O
3O
8 over 2.5 metres. Up to 2.3% Cu was intersected in clay-altered lithologies nearly 100 metres below the unconformity in this hole as well.