SEPANG: Land border agreements involving 12 sectors have yet to be finalised between the states concerned, says Energy and Natural Resources Minister Datuk Seri Takiyuddin Hassan.
KUALA LUMPUR, Sept 16 Science, Technology and Innovation Minister Datuk Seri Dr Adham Baba launched a drone development zone dubbed “Area 57” at Technology Park Malaysia, here today. He said the location was equipped with a 100m runway, 300-sq-m drone net area, drone testing mock-up site,.
Planned Tasik Chini forest reserve revised to exclude mining site
Modified22 Jun 2021, 11:58 pm
A
-
A royalty-linked mining site that was initially supposed to be part of the planned Tasik Chini forest reserve has been removed from the earmarked area.
Malaysiakini learnt that the 40.51-hectare mining site, around the size of 60 Olympic football fields and located 3km away from Tasik Chini, was excluded by means of a state government gazette.
Pahang Survey and Mapping Department (Jupem), when contacted, confirmed that the mining site at Lot 87978 in Mukim Penyor was initially supposed.
All Access Plan