Page 4 - Geovia Surpac News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Stay updated with breaking news from Geovia surpac. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Top News In Geovia Surpac Today - Breaking & Trending Today

Investegate |Endeavour Mining Corporation Announcements | Endeavour Mining Corporation: Endeavour Reports Positive PFS Results For Both Fetekro and Kalana, Confirming Strong Organic Growth Pipeline


Endeavour Reports Positive PFS Results For Both Fetekro and Kalana, Confirming Strong Organic Growth Pipeline
ENDEAVOUR REPORTS POSITIVE PFS RESULTS FOR BOTH FETEKRO AND KALANA, CONFIRMING STRONG ORGANIC GROWTH PIPELINE
HIGHLIGHTS:
Positive PFS results for both Fetekro and Kalana Projects confirm Endeavour’s high quality organic growth pipeline
Fetekro PFS shows potential for +200kozpa production at low AISC over long mine life:
10-year mine life based on current reserves of 2.1Moz
Average annual production of 209koz at AISC of $838/oz
Robust economics with after-tax NPV
5%
Kalana PFS shows potential for 150kozpa production at low AISC over long mine life:
11-year mine life based on current reserves of 1.8Moz ....

Mali General , Coted Ivoire , Optiro Pty , Paul Blackney , Geovia Surpac , Knight Piesold , Kevin Harris , Fetekro Lafigu , National Instrument , Snowden Group , Energy Intensity , Lycopodium Minerals Pty Ltd , Endeavour Mining Group Resource Geologist , Company Foundation Agreement , Avnel Gold Mining Limited , Canadian Institute Of Mining , Endeavour Reports Positive , For Both Fetekro , Confirming Strong Organic Growth Pipeline , Kalana Projects , Endeavour Mining , Pre Feasibility Study , Definitive Feasibility Study , Definitive Feasibility Studies , Technical Report , Mineral Projects ,

BASE RESOURCES LIMITED - Kwale North and Bumamani Resources Estimates


BASE RESOURCES LIMITED - Kwale North and Bumamani Resources Estimates
PR Newswire
Key Points
As part of the pre-feasibility study currently underway to assess the viability of mining the Kwale North Dune and Bumamani deposits, seeking to extend the mine life of Kwale Operations, additional drilling and mineralogy assessments have been conducted.
The Kwale North Dune Mineral Resources estimate has increased by 13% to 194 million tonnes at an average HM grade of 1.5%, containing 2.9Mt HM, based on a 1% HM cut-off grade.
99% of the Kwale North Dune Mineral Resources estimate is now reported in the Measured and Indicated categories.
The maiden Bumamani Mineral Resources estimate is 5.9 million tonnes at an average HM grade of 1.9%, containing 0.115Mt HM, based on a 1% HM cut-off grade. ....

United Kingdom , Shimba Hills , City Of , Western Australia , Gareth Tredway , Greg Jones , Matthew Armitt Detlir Elezi , Jos Simson , James Fuller , Stephen Allen , Geovia Surpac , Maxwell Geoservices , Scott Carruthers , Tiomin Resources Inc , Resource Resources , Tavistock Communications , Titanium Limited , Consultant Geologist For Base Resources , Resources Limited , Australasian Institute Of Mining , Minerals Council Of Australia , Kenya Ministry Of Petroleum Mining , Ore Reserves Committee , Robbins Geological Services , Australian Institute Of Geoscientists , Bumamani Resources ,