Tuesday, 23 February 2021 10:45
The withdrawal of a second contender to supply both Armoured and Tactical Bridging Systems for the British Army s TYRO project, means that UK military bridge designer and manufacturer WFEL is now the sole bidder. Project TYRO aims to provide UK Heavy Forces with Close Support Bridge (CSB) and General Support Bridge (GSB) capabilities for the British Army s Royal Engineers (RE) to cross wet and dry gaps, both on the battlefield and in emergency and disaster relief situations.
WFEL Dry support bridge DSB (Picture source: WFEL )
The TYRO requirements are for Close Support Bridges (CSB) to be deployed, launched and recovered from armoured vehicles (AVLB) and a wheeled launcher (WVLB) and for the General Support Bridges (GSB) to be self-deployed, providing MLC 100 (Tracked) capability in order to support unrestricted crossing by UK Heavy Forces.
UK-based WFEL Ltd is now the sole contender for the major British Army bridging programme known as Project Tyro, after the withdrawal of Rheinmetall BAE Systems Land (RBSL) from the competition. RBSL and WFEL completed the Assessment Phase (.