comparemela.com

Latest Breaking News On - Farellon output - Page 1 : comparemela.com

Altiplano Metals Reports April 2023 Results at Farellon with 1 72 % Cu Grade

Altiplano Reports April 2023 Results at Farellon with 1 72 % Cu Grade

Altiplano Metals Inc. is pleased to report on the April 2023 operating results from the Farellon Copper-Gold mine located near La Serena, Chile. During the month of April, approximately 3,022 tonnes of mineralized copper-gold material was produced at. - Veroeffentlicht am 07.06.2023

Altiplano Metals Inc : 2023 New Year Greetings and Update from Alastair McIntyre CEO

Altiplano Metals Inc : Altiplano Reports November 2022 Results at Farellon with Copper Grade at 2 10%

Altiplano Metals Inc : Altiplano Reports January Production Results with Increased Revenue

Altiplano Metals Inc.: Altiplano Reports January Production Results with Increased Revenue Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ( Altiplano or the Company ) is pleased to report on the January 2021 production results of from the Farellon Copper-Gold (Cu-Au) mine located near La Serena, Chile. During January 2021, Farellon produced approximately 3,480 tonnes of mineralized Cu/Au material at an approximate grade of 1.8% copper with shipments for processing totaling 2,770 tonnes. January revenue (after processing costs) generated US$220,000 from the sale of 151,960 pounds of copper compared with US$150,000 and 90,660 pounds of copper in December. At January month end, an additional 610 tonnes were stockpiled and available to be shipped.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.