Live Breaking News & Updates on Earth Pressure Balance Tunnel Boring Machine

Stay updated with breaking news from Earth pressure balance tunnel boring machine. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Excavation Complete on NEBT Project in Washington, D.C. : CEG


Thu May 13, 2021 - Northeast Edition
Lane Construction
The Earth Pressure Balance Tunnel Boring Machine (TBM) “Chris” has completed the combined sewer outflow (CSO) tunnel being built to improve the water quality of the Anacostia River in Washington, D.C.
Excavation of the Northeast Boundary Tunnel (NEBT) in Washington, D.C., a joint-venture project valued at $580 million being constructed by
The Lane Construction Corporation and its parent company,
Webuild Group (formerly Salini Impregilo), is complete.
The Earth Pressure Balance Tunnel Boring Machine (TBM) Chris has completed the combined sewer outflow (CSO) tunnel being built to improve the water quality of the Anacostia River in Washington, D.C. The 23-ft. inside diameter tunnel was successfully completed with about 27,700 ft. excavated and 4,442 rings installed. The tunnel starts at RFK Stadium and ends at R Street, NW near downtown D.C. ....

District Of Columbia , United States , Anacostia River , Salini Impregilo , Construction Corporation , Webuild Group , Earth Pressure Balance Tunnel Boring Machine , Northeast Boundary Tunnel , Lane Construction Corporation , Clean Rivers Project , Anacostia River Tunnel , Lane Salini Impregilo , Ship Canal Water Quality Project , மாவட்டம் ஆஃப் கொலம்பியா , ஒன்றுபட்டது மாநிலங்களில் , அனகோஸ்டியா நதி , கட்டுமானம் நிறுவனம் , வடகிழக்கு எல்லை சுரங்கம் , சந்து கட்டுமானம் நிறுவனம் , சுத்தமான ஆறுகள் ப்ராஜெக்ட் , அனகோஸ்டியா நதி சுரங்கம் , கப்பல் கால்வாய் தண்ணீர் தரம் ப்ராஜெக்ட் ,