comparemela.com

Latest Breaking News On - Dylan jeffries - Page 1 : comparemela.com

Transcripts For WAVY WAVY News 10 20160209

1015mph. Tomorrow, ncdot plans to see how nc 12 held up during last nights storm. Hawk has fallen prey to strong wind and waves before. The mayor tells us, there was some overwash, but the structure held up over the weekend. Even though theres no rush, he says a road expert will check to see if it needs any make sense to kind of but its their call. 17 02 he also tells us bidding will start for a larger beach renourishment project tomorrow. The plan would extend the beaches in duck, kitty hawk, and Kill Devil Hills another 100 feet to protect nc12. We can show you some of the flooding that storm caused on the outer banks. This is video from hatteras at the Cape Hatteras motel in buxton. Sunday, we reported heavy rain and 50 mileperhour winds in parts of the outer banks. It left flooding and beach erosion behind. Hyde county Officials Say the water has receded in ocracoke, but pockets of water remain in some spots. They say drivers havent been having any issues getting through. Emergency

Transcripts For WVBT WVBT Local News 20160209

1015mph. Tonight evening showers taper by midnight. Lows in the midupper 30s. Tuesday mainly cloudy with a few evening showers. Highs in the midupper 40s. Wind wsw tomorrow, ncdot plans to see how nc 12 held up during last nights storm. This stretch in kitty hawk has fallen prey to strong wind and waves before. The mayor tells us, there was some overwash, but the structure held up over the weekend. Even though theres no rush, he says a road expert will check to see if it needs any repairs. We can show you some of the flooding that storm caused on the outer banks. This is video from hatteras at the Cape Hatteras motel in buxton. Sunday, we reported heavy rain and 50 mileperhour winds in parts of the outer banks. It left flooding and beach erosion behind. Hyde county Officials Say the water has receded in ocracoke, but pockets of water remain in some spots. They say drivers havent been having any issues getting through. Emergency washed out part of a dune on hatteras, and crews have been

WSDOT resumes Highway 14 construction, expects to wrap up $28 million project in fall

The Washington State Department of Transportation resumed construction this week on state Highway 14 between Interstate 205 and Southeast 164th Avenue in Vancouver after pausing for the winter.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.