Live Breaking News & Updates on Design Studios|Page 7
Stay updated with breaking news from Design studios. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
This morning. We dont have much to report. Thats good news that makes life easier for you getting out on the door and lets take you to the Golden Gate Bridge and been reporting of a single spinout earlier and thats really all we have of major concern, even across parts of the peninsula and the south bay not really looking at our highways being affected all that much. There is an accident before 101 and were seeing the typical slowing on 101, as well. Slowing through the sunol grade but otherwise wideopen roads on this friday and no fooling you here. Thank you, anthony. Well, not everybody is accepting acceptance week. Curriculum focusing on lesbian, gay and transgender issues at a San Ramon School has some parents threatening to take their kids out of class. Live in san ramon and, steph, there are the parent who say theyre mad and voice their concerns to districters in ....
The proposed project is a complete on townsend we are built those buildings are brick unreinforced the same owner in filed with the concrete building 5 phase wide bears on the brick walls like the quote we included on the submittal packet if here today a new building weve surveyed the property lines in the wall these 3 buildings are party wall structures the building in the Historic District it is soft story not brimentd under the cutters zoning converted to office use that matter will be heard tomorrow at the Planning Commission we have copies of the origin drawings and comparing to what exists to those drawings if you changes have been made to the interior is Building Codes has changed townsend does not meet codes for the disabled exits our proposal is upgrades in all the areas this is a plan of a typical upper ....
The proposed project is a complete on townsend we are built those buildings are brick unreinforced the same owner in filed with the concrete building 5 phase wide bears on the brick walls like the quote we included on the submittal packet if here today a new building weve surveyed the property lines in the wall these 3 buildings are party wall structures the building in the Historic District it is soft story not brimentd under the cutters zoning converted to office use that matter will be heard tomorrow at the Planning Commission we have copies of the origin drawings and comparing to what exists to those drawings if you changes have been made to the interior is Building Codes has changed townsend does not meet codes for the disabled exits our proposal is upgrades in all the areas this is a plan of a typical upper ....
The proposed project is a complete on townsend we are built those buildings are brick unreinforced the same owner in filed with the concrete building 5 phase wide bears on the brick walls like the quote we included on the submittal packet if here today a new building weve surveyed the property lines in the wall these 3 buildings are party wall structures the building in the Historic District it is soft story not brimentd under the cutters zoning converted to office use that matter will be heard tomorrow at the Planning Commission we have copies of the origin drawings and comparing to what exists to those drawings if you changes have been made to the interior is Building Codes has changed townsend does not meet codes for the disabled exits our proposal is upgrades in all the areas this is a plan of a typical upper ....