The latest results confirm thickness and tenor of mineralisation present outside the Morila Super Pit in good signs for the presence of high-grade gold.
Firefinch marks another milestone in Morila ramp-up with Pit 5 ore hitting gold comminution circuit
Firefinch has an 80% interest in the Morila Gold Mine, which has produced 7.5 million ounces of gold since 2000. A truck direct loading to the oxide circuit dump pocket during commissioning at the Morila Gold Project
Firefinch Ltd (ASX:FFX) (OTCMKTS:EEYMF) (FRA:N9F) has achieved another milestone in the second stage of its ramp-up strategy with commissioning of the Morila Gold Mine comminution circuit in Mali, West Africa, using stockpiles as well as feed from Morila Pit 5.
The company’s open pit mining of Morila’s satellite pits is forecast to increase production from around 50,000 ounces of gold in 2021 to about 120,000 ounces in 2022.