Work on Thirumudivakkam bridge nearing completion Updated: Updated: Construction of last span is likely to be completed in another month Share Article Construction of last span is likely to be completed in another month Work on the bridge across the surplus channel of the tank at Thirumudivakkam is nearing completion. The water course cuts across the Pallavaram-Thiruneermalai-Thirumudivakkam Road. “It was a pipe culvert earlier and the stretch was flooded in 2015 and 2017 since the culvert could not carry the excess water, which is why we have converted it into a minor bridge with six spans. This will allow a two-way traffic,” said a source in the Highways Department, which took up the work with an estimate of ₹1.8 crore.