Another wind project on the East Coast may face challenges with turbine installation due to glauconite, a soil that crushes under high pressure. Preliminary geotechnical analysis for New England Wind, an Avangrid project, showed a risk of turbine pile foundation refusal in 50 of nearly 130 turbine locations, or about 40%, according to 2023 records obtained through a Freedom of Information Act request.