Waterville announces schedule for $11.2 million downtown pro

Waterville announces schedule for $11.2 million downtown project


Waterville announces schedule for $11.2 million downtown project
Work on the revitalization project to change traffic to two-way on Main and Front streets and improve intersections and sidewalks will kick off March 15.
Share
One-way traffic moves through downtown Waterville on June 5, 2019, on Main Street. At a meeting Maine Department of Transportation Highway program officials explained plans to turn the street into a two-way street. Now those plans will take shape as construction on the project begins March 15.
Morning Sentinel file
WATERVILLE — A long-anticipated $11.27 million project to change the traffic pattern on Main and Front streets and improve sidewalks and intersections is planned start March 15.

Related Keywords

Colby College , Maine , United States , Kennebec , Waterville , Joan Commons , , Crooker Construction Inc , Maine Department Of Transportation , Waterville Savings Bank , Paulj Schupf Art Center , Lockwood Hotel , Us Department Of Transportation , Maine Chamber , Maine Department , Crooker Construction , Mid Maine Chamber , Main Street , Bridge Street , Temple Street , College Avenue , Front Street , Waterville Downtown Page , Joan Alfond Main Street Commons , Arts Collaborative , Art Center , Morning Sentinel , கோல்பி கல்லூரி , மைனே , ஒன்றுபட்டது மாநிலங்களில் , கென்னேபெக் , வாட்டர்வில்லே , ஜோன் காமன்ஸ் , க்ரூக்கர் கட்டுமானம் இன்க் , மைனே துறை ஆஃப் போக்குவரத்து , வாட்டர்வில்லே சேமிப்பு வங்கி , லாக்வுட் ஹோட்டல் , எங்களுக்கு துறை ஆஃப் போக்குவரத்து , மைனே அறை , மைனே துறை , க்ரூக்கர் கட்டுமானம் , நடுவில் மைனே அறை , பிரதான தெரு , பாலம் தெரு , கோயில் தெரு , கல்லூரி அவென்யூ , முன் தெரு , வாட்டர்வில்லே நகர பக்கம் , ஜோன் அல்ப்பின்ட் பிரதான தெரு காமன்ஸ் , கலைகள் கூட்டு , கலை மையம் , காலை செண்டினல் ,

© 2025 Vimarsana