Watch | First footage from on board the Luton Dart : compare

Watch | First footage from on board the Luton Dart


Starting at a new purpose-built Luton Parkway station – which connects to the Network Rail station – the Dart will run on a 350m long viaduct, before transitioning to a 72m long, 1,000t steel truss bridge with composite deck that runs over a live dual carriageway.
The Dart then weaves its way past Luton Airport’s landing lights, through a 600m long cut and fill section before entering a 500m long concrete base trough section.
It then heads underground into a 350m cut and cover tunnel, which dips beneath the airport’s taxiway and into a new Central Terminal station, 20m beneath the airport’s current “drop-off” area.

Related Keywords

Phil Hobson , Luton Dart , Luton Airport Ltd , Luton Direct Air Rail Transit , Luton Airport Parkway , London Luton Airport , Airport Ltd , Luton Parkway , Network Rail , Luton Airport , Central Terminal , High Speed , Tony Gee , Doppelmayr Cable Car , பில் ஹாப்சன் , லூட்டன் டார்ட் , லூட்டன் விமான லிமிடெட் , லூட்டன் நேரடி அேக ரயில் போக்குவரத்து , லூட்டன் விமான பூங்கா , லண்டன் லூட்டன் விமான , விமான லிமிடெட் , லூட்டன் பூங்கா , வலைப்பின்னல் ரயில் , லூட்டன் விமான , மைய முனையத்தில் , உயர் வேகம் , டோனி ஜீ ,

© 2025 Vimarsana