On 8 January 2021 at 14:05 CET the synchronous area of Continental Europe was separated into two parts due to outages of several transmission network elements in a very short time. ENTSO-E has published the first information on the event already on 8 January 2021, followed by an update with geographical view and time sequence on 15 January 2021. Since then, ENTSO-E has analysed a large portion of relevant data aiming to reconstruct the event in detail.
This second update presents the key findings of detailed analyses, which have a preliminary character subject to new facts, which will emerge in the still ongoing investigation.

Related Keywords

Italy ,Hungary ,United Kingdom ,France ,Spain ,Turkey ,Great Britain , ,Electricity Coordination Group ,Expert Investigation Panel ,Commission Regulation ,European Commission ,National Regulatory Authorities ,Continental Europe ,Sremska Mitrovica ,Novi Sad ,Continental Europe Synchronous Area ,Northwest Area ,South East Area ,Transmission System Operators ,Member States ,System Operation Guideline ,Expert Investigation ,European Awareness System ,Northeast Area ,இத்தாலி ,பசி ,ஒன்றுபட்டது கிஂக்டம் ,பிரான்ஸ் ,ஸ்பெயின் ,வான்கோழி ,நன்று பிரிட்டன் ,மின்சாரம் ஒருங்கிணைப்பு குழு ,நிபுணர் விசாரணை குழு ,தரகு ஒழுங்குமுறை ,ஐரோப்பிய தரகு ,தேசிய ஒழுங்குமுறை அதிகாரிகள் ,கண்டம் யூரோப் ,புதிய சோகம் ,வடமேற்கு பரப்பளவு ,தெற்கு கிழக்கு பரப்பளவு ,பரவும் முறை அமைப்பு ஆபரேட்டர்கள் ,உறுப்பினர் மாநிலங்களில் ,அமைப்பு செயல்பாடு வழிகாட்டல் ,நிபுணர் விசாரணை ,ஐரோப்பிய விழிப்புணர்வு அமைப்பு ,வடகிழக்கு பரப்பளவு ,

© 2024 Vimarsana

comparemela.com © 2020. All Rights Reserved.