Support to the architectural design of new bridges after des

Support to the architectural design of new bridges after destruction by heavy rains of essential infrastructure at Rwenzori Mountains National Park


Search
Support to the architectural design of new bridges after destruction by heavy rains of essential infrastructure at Rwenzori Mountains National Park
Wednesday, 20 January 2021
at 10:00:00
1 min read
Following the destruction of protected area infrastructures caused by excessive rain and the resulting flooding that occurred in May 2020, UNESCO, through the Government of China Funds for Capacity Building and Cooperation for World Heritage in Africa, and in collaboration with the Uganda Wildlife Authority, supported the preparation of architectural designs for five bridges along Central circuit and Kilembe tourist routes within the Rwenzori Mountains National Park, a World Heritage property in Uganda.
Conceived as replacement of the previous bridges, which were washed away during the heavy rains, the five new structures will be reconstructed at the exact locations of those that were destroyed. There will however be a major increase in height to allow for better floodwater under-bridge clearance.

Related Keywords

China , Rwenzori Mountains National Park , Kasese , Uganda , Kilembe , , International Emergency Assistance , International Union For Conservation Of Nature , World Heritage Fund , Uganda Wildlife Authority , China Funds , Capacity Building , World Heritage , International Union , சீனா , உகந்த , சர்வதேச அவசரம் உதவி , சர்வதேச தொழிற்சங்கம் க்கு பாதுகாப்பு ஆஃப் இயற்கை , உலகம் பாரம்பரியம் நிதி , உகந்த வனவிலங்கு அதிகாரம் , சீனா நிதி , திறன் கட்டிடம் , உலகம் பாரம்பரியம் , சர்வதேச தொழிற்சங்கம் ,

© 2025 Vimarsana