Article content The municipal district has received a petition with 400 signatures signaling opposition to the proposed Castle Meridian Wind Facility. The project from Clem Geo Energy would be bordered by Highway 507 to the south and Highway 11 to the east, and is expected to generate 22 Megawatts of power. According to the Clem Geo website the company is currently at the feasibility study stage with the development. We apologize, but this video has failed to load. Try refreshing your browser. Strong opposition to proposed wind farm Back to video “As landowners, public stakeholders and members of the local community we are stating our opposition to the project as whole, specifically to the siting of four proposed 180 meter [high] turbines,” the petition read.