Chief minister Himanta Biswa Sarma laid the foundation stone of a 25MW solar power project at Namrup in Dibrugarh district. The joint project by Assam Power Generation Corporation Limited and Oil India Limited is expected to raise green power generation. It will be built at a cost of Rs 115 crore on a 107-acre plot.