Pasofino Gold Limited: Pasofino Gold Provides Further Results for the Dugbe F Infill Drilling Program
Pasofino" or the "
Company") is pleased to announce that it has received results from a further 18 holes drilled at the Dugbe F deposit. The drill results continue to prove the consistency of the grade throughout the deposit. Dugbe F is one of two deposits on the Dugbe Gold Project, in which the Company has an option to earn a 49% economic interest (prior to the issuance of the Government of Liberia's 10% carried interest).
Highlights
Of the 36 infill holes drilled within the deposit 'footprint' at Dugbe F since the start of the program in January, 34 have intersected the main mineralised layer, supporting the continuity of this extensive and shallow gold mineralised 'sheet' which is approximately 2.5 km in length and up to 1.3 km wide.