The Mumbai Metropolitan Region Development Authority (MMRC) has received 5 of the 9 rakes needed for the Aarey-BKC Metro services. The rakes have been manufactured by Alstom, and they are currently being tested at the MMRC's depot in Aarey. The corridor is expected to be operational by December 2023 - , Mumbai News, Times Now