Mississippi pump project gets go-ahead, but needs funding :

Mississippi pump project gets go-ahead, but needs funding


Mississippi pump project gets go-ahead, but needs funding
By EMILY WAGSTER PETTUSJanuary 15, 2021 GMT
JACKSON, Miss. (AP) — The U.S. Army Corps of Engineers on Friday gave the green light to long-debated flood control project in Mississippi. But the project still needs federal funding, and the start of construction could be years away — if it happens at all.
Conservation groups sued the Environmental Protection Agency this week to try to block the project. They argue that the EPA last year improperly reversed its own 2008 veto of massive pumps for the rural Yazoo Backwater Area. The expanse of rural flatlands is between the Mississippi and Yazoo rivers, north of Vicksburg. Much of it is used for farming.

Related Keywords

Deer Creek , Mississippi , United States , American , Diana Holland , Roger Wicker , Emily Wagster Pettus , Donald Trump , Cindy Hyde Smith , Bennie Thompson , Andrew Wheeler , Environmental Protection Agency , Us Army Corps Of Engineers On , Sierra Club , National Audubon Society , Yazoo Backwater , President Donald Trump , Yazoo Backwater Pumps , American Rivers , Clean Water , Technology , Us News , Environment , Vicksburg , மான் க்ரீக் , மிசிசிப்பி , ஒன்றுபட்டது மாநிலங்களில் , அமெரிக்கன் , டயானா ஹாலண்ட் , ரோஜர் தீய , டொனால்ட் துருப்பு , சிண்டி ஹைட் ஸ்மித் , பென்னி தாம்சன் , ஆண்ட்ரூ சக்கர வாகனம் , எங்களுக்கு இராணுவம் கார்ப்ஸ் ஆஃப் பொறியாளர்கள் ஆன் , சியரா சங்கம் , தேசிய ஆடுபோன் சமூகம் , ய்யாஸூ பின் நீர் , ப்ரெஸிடெஂட் டொனால்ட் துருப்பு , ய்யாஸூ பின் நீர் விசையியக்கக் குழாய்கள் , அமெரிக்கன் ஆறுகள் , சுத்தமான தண்ணீர் , தொழில்நுட்பம் , எங்களுக்கு செய்தி , சூழல் , விக்ஸ்ஸ்பர்க் ,

© 2025 Vimarsana