Minister of Energy Ibrahim Matola has assured electricity consumers of an end to loadshedding following the restoration of three out of four power generation machines at Kapichira Hydro Electric Power Station in Chikwawa. The minister told a press conference in Lilongwe yesterday that to date three generation machines producing 97 megawatts (MW) have been restored