Notice is given that the following permit was issued on April 22, 2021: Big Top Manufacturing, Inc., 3255 N US HWY 19, Perry, FL 32347 permit# ERP-123-204321-8. The project is located in Taylor County, Florida, Section 4, Township 4 South, Range 7 East. The permit authorizes a surface water management system on 23.39 acres for construction of 7.31 acres of impervious surfaces known as Big Top Expansion. The receiving water body is n/a (self contained). A person whose substantial interests are or may be affected has the right to request an administrative hearing by filing a written petition with the Suwannee River Water Management District (District). Pursuant to Chapter 28-106 and Rule 40BB-1.1010, Florida Administrative Code (F.A.C.), the petition must be filed (received) either by delivery at the office of Live Oak, FL 32060 or by e-mail to [email protected], within twenty-one (21) days of newspaper publication of the notice of intended District decision (for those persons to whom the District does not mail or email actual notice). A petition must comply with Sections 120.54 (5)(b)4 and 120.569(2)(c), Florida Statues (F.S.), and Chapter 28106, F.A.C. The District will not accept a petition sent by facsimile (fax). Mediation pursuant to Section 120.573, F.S., is not available.