G CAPITAL Bhd signed a 21-year Renewable Energy Power Purchase Agreement (REPPA) with Tenaga Nasional Bhd (TNB).In a filing to Bursa Malaysia today the company said the group’s 96%-owned subsidiary Gunung Hydropower Sdn Bhd has on 12 August 2021 signed a REPPA with TNB for a Feed-in-Tariff (FiT) concession period of 21 years for electricity to be generated from its 10.0MW low-head mini-hydropower plant situated on Sungai Perak, Salu.